- 703.645.0280
- contactus@belstar.com
Projects
Menu
Sanitary/Civil
- Alexandria Wastewater Treatment Plant
Alexandria, VA– Cost estimates and life cycle cost analysis - Blue Plains Sanitary Sewage Treatment Plant
Washington, DC–Cost estimates, scheduling, constructability reviews, life cycle cost analysis - District of Columbia Water & Sewer Authority – selected a Belstar-led team to provide Construction Management Services on the Anacostia River Combined Sewer Overflow Control Project – Div 1 – Main Pumping Station Diversions (CSO), Div D Joint Base Anacostia Bolling (JBAB) Overflow & Diversion Structures
Washington, DC– Construction Management Services - District of Columbia Water Poplar Pumping Station Project (Part of O’Brien & Gere Team) was awarded an extra work order)
Washington, DC– Cost estimating - Grottoes Wastewater Treatment Facility
Grottoes, VA– Construction management - Maine and O Street Pumping Station
Washington, DC–Cost estimating services - Open-End Contract, Washington Suburban Sanitary Commission
Washington, DC– Cost estimating and scheduling - Maryland Department of General Services – Civil Investigative, Design, and Engineering Services Contract (Including: Rocky GAP, Greenbrier Boat Docks, Fire Tower Restoration at Churhc Creek Forestry Office)
Belstar provided construction cost estimating and scheduling services. - DC Water Clean Rivers Program – Division J – Northeast Boundary Tunnel, Washington, DC
Belstar provided construction management support services. - DC Water – Potomac River Tunnel Contract B
Belstar is providing construction management support services. - Maryland Environmental Service – Deep Creek Lake Arrowhead Cove Dredging Project, Garrett County, MD
Belstar provided construction inspection services for the Deep Creek Lake Arrowhead Cove Dredging project. The project consists of mechanical removal of up to 15,000 cubic yards of sediment from a cove in the lake, dewatering the material at an adjacent upland staging area, and then transporting the material to the local landfill where the material will be used as cover. Excavation will take place from the dewatered area. The material is dewatered prior to hauling and the material to be trucked has to pass the paint filter test. The staging area is immediately adjacent to the dredging area. Cost: $77,000